KUALA LUMPUR: Some 36 rural water supply projects in Sabah and Sarawak, with a combined cost of over RM1.6bil have been delayed by up to seven years and left thousands of households without clean and treated water, the Auditor-General’s Report 2/2024 has revealed. Read full story