JOHOR BARU: The infrastructure of the Rapid Transit System Link (RTS Link) was 65% ready as of Dec 31, putting the project on track for completion by the end of 2026. Read full story
JOHOR BARU: The infrastructure of the Rapid Transit System Link (RTS Link) was 65% ready as of Dec 31, putting the project on track for completion by the end of 2026. Read full story