KUALA LUMPUR: The main road connecting Kuala Lipis to Gua Musang, which was closed for piling works for Phases 3B and 3C of the Lingkaran Tengah Utama (LTU) Expressway project in April, has been reopened to traffic. Read full story
KUALA LUMPUR: The main road connecting Kuala Lipis to Gua Musang, which was closed for piling works for Phases 3B and 3C of the Lingkaran Tengah Utama (LTU) Expressway project in April, has been reopened to traffic. Read full story